Scavenge Fire
For the scavenge fire to begin there must be present a combustible material, oxygen to support the combustion process, & a source of heat at a temperature high enough to start the combustion. In...
CONTINGENCY PLAN FOR OIL SPILLAGE/POLLUTION
General
emergency alarm signal : Seven or more short blast followed by one long blast
Emergency:- Immediate
Action Required/Members of The Team
OIL
SPILLAGE/POLLUTION:-
In
event of : Transfer system leak, Tank overflow, suspected cargo tank, fuel tank
hull leak.
Stop operation by...
ENGINE DEVELOPMENTS – CAMSHAFT LESS MAIN ENGINES AND OTHER DIESEL ENGINE DEVELOPMENTS
It
is not usually known that the first airless injection system i.e. not to use
compressed air or to atomise the fuel; was a common rail system. The
development of this system is often mistakenly given to...
PRESSURE SETTING OF SAFETY VALVES
Before attempting to adjust the safety valves of any boiler,its essential to verify the accuracy of the boiler pressure gauge,safety valves must be set at a pressure not exceeding 3% above the approved working...
TECHNICAL QUESTIONS & ANSWERS PART-5
Q. Explain salient features of the guidelines. With reference to the Fuel oil analysis report, describe relevant corrective actions which can be initiated against various adverse observations in it.
Answer:-
THE RELEVANT CORRECTIVE ACTIONS:
a. Density:
i. Max...
CODES AND CONVENTIONS QUESTIONS & ANSWERS PART-20
Q. a) One of the objectives of UNCLOS is protection of marine environment and prevention of pollution. Define pollution as per UNCLOS and discuss the key features of obligations of coastal states in this...
CLASS-1 MUMBAI MMD ORAL QUESTIONS PART-8
Date - 21-02-2020
Internal - Vikrant rai sir
External - Pal sir
Q. Started with introduction and experience.
Q. Registration of ship.
Q. ESP: Have you seen ESP? how does it looks like?
Q. Why coating is required, types of...
RUDDER SURVEY
Checks on rudder in drydock
When ship enters
dry dock and pumping out water, check water whether water is coming out from
rudder or not. If yes, then rudder is breached.Open the
top and bottom plug and check...
CLASS-4 KOLKATA MMD ORAL QUESTIONS PART-2
Function - 4b
Surveyor - Biswas & Rao sir
Q. VIT in Sulzer. How fuel quantity is adjusted. How Eccentric is connected. Where connected.
Q. Boiler tubes Construction. Draw. Material.
Q. What is Caustic Embrittlement. Which area, what...